Call sheet beside a Digital Cinema Package delivery checklist

A call sheet is the working document that organizes one shoot day: who must arrive, where they must go, what will be filmed, and when each activity happens. A useful call sheet example also gives the crew safety, access, parking, meal, and contact information in one place.

After filming and post-production, a different document takes over. Use a simple call sheet template before each production day; create a Digital Cinema Package (DCP) when the finished film is ready for cinema exhibition.

What a Simple Call Sheet Template Must Communicate

A call sheet should let every crew member answer four questions quickly: when do I report, where do I go, what am I doing, and who do I contact if something changes? Include these essential fields:

  • Production details: project title, shoot date, version number, production day, and company name.
  • Key contacts: producer, director, first assistant director, production office, and emergency contact.
  • Location information: address, map or access notes, parking, base camp, holding area, and nearest hospital.
  • Timing: general crew call, individual department calls, cast calls, estimated first shot, meal break, and expected wrap.
  • Weather and conditions: forecast, sunrise, sunset, temperature, and any tide or daylight limits when relevant.
  • Schedule: scene numbers, locations, pages, shot priorities, company moves, and planned order of work.
  • Cast and crew: cast numbers, character names, required departments, special equipment, and transport needs.
  • Practical requirements: wardrobe, makeup, props, vehicles, catering, facilities, safety instructions, and required paperwork.

Keep urgent information near the top, use consistent time formats, and mark changes clearly. A call sheet is useful only when it reflects the actual plan, so the assistant director or production manager should issue the current version and tell recipients when it changes.

Call Sheet Example for a Small Production

This sample call sheet uses a small interior shoot. Replace the details with the information for your own production.

  • Production: “The Last Envelope” | Tuesday, October 15 | Day 3 of 5 | Version 2
  • General crew call: 7:00 a.m. | First shot: 8:30 a.m. | Estimated wrap: 6:00 p.m.
  • Location: 18 Park Street, Bristol | Enter through the rear loading door; crew parking is on the east side.
  • Nearest hospital: St. Anne’s Hospital, 2.1 miles away | Emergency: 112
  • Scenes: 12A, 12B, and 14 | Interior, apartment | 5⅛ pages
  • Cast: 1 (Maya), call 7:30 a.m.; 2 (Jon), call 9:00 a.m.
  • Departments: camera and lighting call 6:30 a.m.; art call 6:45 a.m.; hair and makeup call 7:00 a.m.
  • Requirements: rain effect, envelope prop, practical lamp, two wardrobe changes, quiet on the street during takes.
  • Meal: 12:30 p.m. | Contacts: producer Alex Reed, 555-0142; first AD Priya Shah, 555-0188.

For a reusable structure, build the sheet in this order:

  1. Header: title, date, production day, version, and key contacts.
  2. Arrival block: general call, department calls, cast calls, parking, access, and facilities.
  3. Safety block: emergency procedure, nearest hospital, hazards, weather, and required protective equipment.
  4. Schedule block: scenes in shooting order, locations, estimated durations, company moves, meal, and wrap.
  5. Requirements block: cast, wardrobe, makeup, props, vehicles, equipment, special effects, and notes.

What Is a DCP, and What Does It Contain?

The question “what is a dcp?” has a practical answer: it is a standardized collection of digital files prepared for playback on a cinema server and projector. A DCP is created from the approved final film, not used to organize a shoot day.

Most DCPs contain:

  • Picture: one or more MXF files containing JPEG 2000 image data, commonly mastered at 2K or 4K.
  • Sound: an MXF file containing synchronized, uncompressed PCM audio, such as the theatrical mix.
  • Composition Playlist (CPL): an XML file telling the cinema system which picture, sound, and subtitle assets to play and in what order.
  • Packing List (PKL): an XML inventory that identifies the assets and verifies their integrity.
  • AssetMap and VolumeIndex: supporting files that help the cinema server find and organize the package contents.

Subtitles, captions, multiple language tracks, trailers, and advertisements can be included as additional assets. Encryption may also be used. When it is, a Key Delivery Message (KDM) authorizes a specific cinema system to play the package during an approved time window. The DCP is delivered for technical ingestion, then checked in the target auditorium for picture, sound, subtitles, and playback errors.

Where a Sample Call Sheet and DCP Fit in the Workflow

  1. Pre-production: the team plans locations, cast, equipment, and the shooting schedule.
  2. Before each shoot day: production issues a call sheet with confirmed calls, scenes, access instructions, safety details, and changes. Crew use it to arrive prepared and work in the planned order.
  3. Post-production: editors and finishing teams complete picture, sound, color, subtitles, and quality control. The call sheet remains a production record; it is not converted into a cinema playback file.
  4. Exhibition delivery: the approved master is encoded and packaged as a DCP, tested, and sent to the cinema, festival, or distributor for theatrical playback.

Search

About

Lorem Ipsum has been the industrys standard dummy text ever since the 1500s, when an unknown prmontserrat took a galley of type and scrambled it to make a type specimen book. It has survived not only five centuries, but also the leap into electronic typesetting, remaining essentially unchanged.